City of Mustang, OK - Wastewater Treatment Plant Rehabilitation

The City of Mustang started a phased approach to upgrading their wastewater treatment plant several years ago. CGE completed the design and is currently overseeing construction for rehabilitation of the headworks including a new bar screen, parshall flume with flow meters, by-pass channel, headworks pumps, aeration of the Waste Activated Sludge basin and floating aerators in the flow equalization basin. In 2016, CGE prepared an engineering report, plans and specifications for the next phase which will expand the plant capacity from 2 MGD to 3 MGD and address problems in the grit removal system.

City of Mustang Wastewater Treatment Plant